#1 2018-02-23 02:02:29

xiao1235
Banned
Registered: 2017-12-20
Posts: 1,384

workshop of plant area

on fire is located in workshop of plant area corner, igneous situation is in violent combustion phase, in catch fire there still is another workshop by the position, installing interlocking deck tiles over dirt if cannot command igneous force in time, igneous situation grow like a weed. After knowing particular case, spot commander organizes officers and soldiers to give two squirt to have rush to save life and property instantly,

at 2 when put out conflagration 01 minutes. reinforced composite plastic floor joists Because still has Yin Ran in lumber caboodle, and keep out of workshop component collapse, have the risk of resume combustion at any time. Fire control officers and soldiers uses squirt to undertake clear and cooling to lumber caboodle ceaselessly, keep clear of keep out component slowly. Pass two many hours clear the job,wpc material distributor uk  4 when officers

and soldiers of 30 minutes of fire control deals with spot beyond fire thoroughly end. This on fire builds to wear structural workshop for a steel, make an labor cost to install rice husks deckingappointment with 4 meters high, total floor area makes an appointment with 2300 square metre, ham area makes an appointment with 20 square metre, on fire place is lumber bake room, combustion material is lumber, of very lucky is

Offline

Board footer

Powered by FluxBB