You are not logged in.
Pages: 1
<p>slightly or slightly into the screw to ensure that the rear end of the expansion screw back screw, so that it fully anchored with the grassroots wall. Third, polished 1, uneven cement joints coated with coarse sandpaper, the action is a gentle circular motion, do not parallel along the slab parallel to the direction of grinding. 2, polished in time with a brush to clean up the floating ash. Fourth, for decorative angle 1, </p>
<p>according to the design requirements with ink pop-up need to do the location of the line angle, and horizontal and vertical correction. 2, groove angle slotted plate cut into the notch, the notch at the thinnest not less than 15. 3, convex angle should be cut according to the design size, the line angle and the corresponding foam cement insulation board on both sides of a brush interface agent, and then coated with a special </p>
<p>adhesive to make it firmly bonded. Five, wipe the bottom polymer mortar 1, the configuration of polymer mortar with a special binder. 2, will be configured polymer mortar evenly coated on the board, a thickness of 2. Pressed into the grid 1, the grid should be cut according to the length and width of the face, and should set aside the overlap width. Mesh cutting should be carried out along the latitude and longitude. 2, in the </p>
<p>kitchen pvc ceilings France<br />
best interlocking composite deck tiles<br />
composite deck rating</p>
Offline
Pages: 1