#1 2018-01-31 05:17:04

xiao1235
Banned
Registered: 2017-12-20
Posts: 1,384

discharge to place according

waste gas that did not discharge to place according to the regulation and content of poisonous and harmful air pollution, water pollution content, perhaps did not save the when building a deck what is a flange original record that monitor; Did not install air pollution content, water pollution content to monitor equipment automatically according to the regulation, perhaps not was in charge of net of supervisory equipment couplet according to regulation

and environmental protection, anti skid floor supplier qatar or unwarranted monitors equipment to move normally, " administrative measure " regulation of doctrine of law of prevention and cure of requirement basis air pollution, water pollution prevention and cure is instructed correct, be in 20 thousand yuan of above 200 thousand yuan of the following amerce; Refus does not correct, instruct stop production punish insects resistant decking composite lawfully. And ought to apply for

blowdown licence lawfully but did not apply for, blowdown licence was not obtained to discharge contaminant after perhaps applying for; Blowdown licence did not apply for attractive wpc fence australia continuance blowdown licence after at the expiration of one's term of office of period of validity, perhaps continue application sends license of environmental protection department to still discharge contaminant without the nucleus; By what contaminant still

Offline

Board footer

Powered by FluxBB