#1 2018-01-27 19:18:37

xiao1235
Banned
Registered: 2017-12-20
Posts: 1,384

motor must be stable and low noise

<p>state is the same with the order contract. (6) proofing factory certificate, physical performance test report is consistent with the purchase contract requirements. 2. Structural Adhesive and Weatherproof Glue (1) Check whether the manufacturers, models and specifications, factory certificate and performance report of the Glue are the same as the order contract. (2) Check the rubber cylinder on the date of </p>
<p>manufacture and expiration date in the construction period, with or without expired glue mixed into the product. 3. Sealant at the substrate cleaning (1) Cleaning is to ensure that the hidden wall panels block the key process of adhesion, but also hidden frame curtain wall security, reliability, one of the major technical measures. This project uses xylene as a cleaning agent. (2) When cleaning, pour the xylene on the </p>
<p>cleaning cloth, do not dip the cleaning cloth into the container of xylene, and then wash in sequence in one direction; then wipe the non-volatile solvent with the second dry cloth; Block cloth dirty should be replaced immediately. (3) must be injected within 30 minutes after cleaning, or it will be the second time cleaning. After cleaning the surface, do not touch when handling, to prevent the second pollution. Paste </p>
<p>paint wood grain plastic flooring<br />
84 lumber wall paneling<br />
used decks for sale in hong kong</p>

Offline

Board footer

Powered by FluxBB