You are not logged in.
Is there any command to trigger "Ramps Reconnect" from GCODE boxes?
Our idea is to have the following setup for strict safety regulations:
-Raspberry Pi always on;
-RAMPS control board and projector power controlled through GPIO --> 230V 5V relays
This way we can have projector and RAMPS switched off while not using, without the need for the user to do it manually.
I would like to know: is there any command to use with [[Exec Command]] to trigger RAMPS reconnect? This way we can configure it to automatically switch everything on before printing, trigger reconnect and start all needed operations.
Thanks in advance for help!
Last edited by rob (2017-11-16 16:23:40)
Offline
Offline
Great, thanks for the super fast response.
Offline